Yarmag team members (Tumen -Gerel, Uyanga and Ganbold from right-left above - team leader Lhagva has family leave) had made a good start with a plan for the Childrens Camp and conference centre (by Bogd Khaan Mountain) accompanied by some environmental data, but as yet lack a written brief. The accommodation requirements (200 conference goers, 200 restaurant seats , pool, sauna etc) had been established verbally, in conversation between the college Vice-Director Khashaa and the developer client.
Meanwhile the remainder of the team, Gursed and Tumen-Od (incommunicado with the others) have a sectional schematic and the basis of a Site Analysis. If only they would all talk to each other...
Everybody came together before the Naadam festival break, but team members complained of flooding, power cuts and lack of daylight hindering progress on drawing. I suggested what each group lacked respectively, in terms of a client presentation for Monday, and referred Tumen Gerel to our VSO conference and Equal Step Camp (via my blog - in Mongolian).
Wednesday, July 09, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
The Monday Client Meeting was postponed in the absence of the team members.
Post a Comment