

Meanwhile the remainder of the team, Gursed and Tumen-Od (incommunicado with the others) have a sectional schematic and the basis of a Site Analysis. If only they would all talk to each other...
Everybody came together before the Naadam festival break, but team members complained of flooding, power cuts and lack of daylight hindering progress on drawing. I suggested what each group lacked respectively, in terms of a client presentation for Monday, and referred Tumen Gerel to our VSO conference and Equal Step Camp (via my blog - in Mongolian).
1 comment:
The Monday Client Meeting was postponed in the absence of the team members.
Post a Comment